Packing and loading
After grinding and polishing, there are two steps must be done before loading:
1.The surface of each board is packed with sealing film;
2.Packaged with a wooden frame, better fixed the board.
After that, the terrazzo stone can be loaded via truck.
Category:
Date:
14 3 月, 2023